Vercel
Adapter code for selected deployment operations; live pilot support has not been verified.
Exact surface
Scoped deployment adapter foundation
Controlled-operation scope
Adapter code for selected deployment operations; live pilot support has not been verified.
Enforcement path
The code foundation uses the Gated decision and execution model with explicit environment context.
Requirements
A reviewed operation-specific adapter, scoped deployment authority and an independently verified live-provider proof before pilot use.
Verification · 8 September 2026
Adapter foundations exist in source and local tests. Hosting Gated on Vercel is not a proof that Gated controls Vercel deployments.
Capability status
Scoped deployment execution
PlannedAdapter foundation exists. Actual live-provider execution has not been verified.
Bypass and runtime limits
Only actions explicitly routed through a Gated-controlled execution path are governed. Direct provider credentials and tools can bypass Gated. No native or universal runtime interception is implemented.
Current limitations
Not available for pilot use. No live deployment, production-promotion or environment-change proof has been completed.
